Ottawa Valley Associated Railroaders
Celebrating 50 years of railroading!

 

John Mitchell’s
Canada Southern Railway

      The Canada Southern is designed to represent the NYC high-speed double main track through South Western Ontario in the mid-fifties. The upper level models the Windsor yard and icing facilities, the Detroit passenger terminal, the Detroit River Tunnel and the branch to the Heinz cannery in Leamington.  The lower level represents the small western Ontario town of West Lorne and the division point of St.Thomas.

      The layout is prototypical and operation oriented.  It features NYC luxury passenger trains and high speed through freights as well as local switching.  Two other railroads are modeled.  The Pere Marquette (C&O) is represented by symbol freights and locals running their own trackage from Detroit to St. Thomas, while CPR passenger trains use the Detroit  River Tunnel during the course of their Toronto / Detroit / Chicago routes.  Extensive staging is in place to handle this traffic. 

     The comprehensive fleet of locomotives, passenger & freight equipment are all painted accurately for the mid 50’s paint schemes and weathered extensively.  The Detroit Passenger Terminal and area are well developed scenically, with most other areas under development with building or mockups in place.

Scale: 

HO
Size:                     20 X 40 feet
Prototype: CSR (NYC), C&O, CPR
Locale: Detroit to st. Thomas Ontario
Period: Mid 50's
Layout style: Double level shelf with helix 
Layout height: 40 to 58 inches
Benchwork:  Cantilevered shelf 
Roadbed: Cork on Homosote and  plywood
Track: ME code 55, 70, 83; Atlas 100 in staging
Turnouts:  ME code 70 and 83, Atlas 83, Peco 75 and 100
Minimum radius:  24 inches, most  are substantially largerl
Length of main line: 160 ft. visible, 50  ft in staging, 90 ft. in helix
Scenery:  Carved styrofoam
Backdrop:  Painted masonite, cut out paper flats
Power system:  Digitrax DCC
Operations: Switch lists, dispatcher
Typical Operating Crew:  3 to 8
 

 

John Operating-3.jpg (65135 bytes)

Industry-2.jpg (56684 bytes)

Industry.jpg (56616 bytes)

Windsor Tunnel-2.jpg (24577 bytes)

Staging Switch-2.jpg (60772 bytes)

Icing Platform.jpg (25585 bytes)

Lead to Helix.jpg (28402 bytes)

Updated with pictures as of December, 2006

Dec.2006 029.jpg (183319 bytes)

Dec.2006 008.jpg (183668 bytes)

Dec.2006 014.jpg (145568 bytes)

St. Thomas Yard in front of the station Hudson 5343 arrives at the Michigan Central Station in Detroit with the Mail and Express, Train #13 REA trucks serving the underground express facility

Dec.2006 021.jpg (156704 bytes)

Dec.2006 024.jpg (141386 bytes)
CPR freight in Chatham with reefers filled with produce from SW Ontario NYC fast freight on the main line near Comber, Ont.